Excel Takeoff Sample: Residential Renovation & Second-Floor Addition
An itemized takeoff in Excel for a second-floor addition to an existing home in Florida: 68 line items across 9 CSI divisions.
- Scope:
- Structure: footings, slab, posts, beams and stair.
- Framing: 1,250 LF of TJI floor joists and 1,370 LF of roof rafters, plus exterior, interior and parapet stud walls.
- Roofing: 1,820 SQ FT of asphalt shingles, with sheathing and underlayment.
- Openings and finishes: doors, triple sliding windows, gypsum board, floor and wall finishes.
- Specialties: guardrails, shower enclosures, countertops and closets, plus plumbing fixtures, HVAC and electrical allowances.
- Format: Excel, with a summary by division and the itemized takeoff.
- Impact: a compact addition package, so a remodeler can price new work quickly.