Excel Takeoff Sample: Public Health Services Building (Complete GC)

A complete itemized GC takeoff in Excel for a large commercial healthcare building with full sitework: 434 line items across 14 CSI divisions. This is your largest sample.

  • Scope:
    • Structure: concrete piers, pile caps and slab; 76 line items of structural steel (columns, beams, joists, decking).
    • Interiors: 130,000+ SQ FT of gypsum board, 65,000 SQ FT of metal stud framing with sound insulation, 168,000 SQ FT of paint, flooring, wall tile and ceilings.
    • Openings: 213 wood doors with hardware, storefront and curtain wall.
    • Specialties and equipment: bath accessories, elevator, kitchen equipment and 706 motorized roller shades.
    • Sitework: 91 line items of exterior improvements (paving, sidewalks, curbs, signage, retaining walls), landscaping and plant counts, grading, and 42 line items of underground utilities.
  • Format: Excel, with a summary by division and the itemized takeoff, with waste factors applied.
  • Impact: a full commercial package, from building to site to utilities, that a commercial GC can price for a public bid.